After scoping on-site electrical and automation requirements and installing the necessary equipment, we conducted rigorous testing. This ensured that the boiler could receive signals from Open Country’s control systems during grid events, monitor the boiler load when the event occurs, and, most importantly, work as expected without causing any disruption to site operations.